Dorna Automation Solutions (DAS)
Call +1 (480) 744-6106

The Real Cost of Hand Palletizing

Hand palletizing looks free. Nobody writes a purchase order for it; the cases just get stacked by whoever is standing at the end of the line. But it is one of the most expensive jobs in a small plant — the wage is only the first line of the bill. Here is the full accounting, with the assumptions stated openly so you can run it with your own numbers.

First, the direct labor math

Start with what one person stacking cases actually costs. The wage on the job posting is not the cost — the fully burdened cost is: wage plus payroll taxes, workers' compensation premiums, benefits, and paid time off. A burden of roughly 25% on top of the wage is a common planning assumption.

Illustrative example — stated assumptions: a stacker paid $20/hour; a 1.25 burden multiplier, giving a fully burdened cost of $25/hour; one shift ≈ 173 working hours per month.

One person, one shift: $25 × 173 hours = $4,325 per month — about $51,900 per year.

Two people on the end of the line (common when cases come fast, or one stacks while the other wraps and hauls): $8,650 per month — about $103,800 per year.

Two shifts with one stacker each: the same $8,650 per month, before any shift differential or overtime.

And that assumes the shift is actually covered. Every sick day, vacation, and no-show is either overtime for someone else or a line that slows down. Keep that number in mind — we will come back to it — because everything below is on top of it.

The cost of injuries

Hand palletizing is repetitive lifting with twisting: pick a case off the conveyor, turn, place it on the pallet, repeat — hundreds of times a shift, with cases that can weigh up to 20 kg (44 lb). Shoulders, backs, and wrists take the load. Repetitive-strain and overexertion injuries are a well-known exposure in warehousing and packaging work, and they are expensive in ways that go well beyond the medical bill:

A single serious strain injury can plausibly cost a small company tens of thousands of dollars once medical, indemnity, premium, and disruption costs are combined. You do not need a precise statistic to see the shape of the risk: the job is physical, repetitive, and performed by your most replaceable — and most frequently replaced — employees.

Turnover and retraining

End-of-line stacking is the job nobody keeps. It is physically hard, monotonous, and usually the lowest-paid position on the floor, so it churns. Every departure restarts a cycle: recruiting, interviewing, onboarding, safety training, and the slow first weeks while a new hire gets up to speed and learns your pallet patterns. Even at a modest estimate of a few thousand dollars per replacement — another planning figure, not a statistic — a position that turns over two or three times a year quietly consumes five figures. Meanwhile, supervisors spend management time on the least strategic problem in the plant: who is stacking today?

Inconsistent stacking and rework

Tired people stack tired pallets. Patterns drift, cases overhang, layers lean. The costs show up downstream: crushed corners and damaged product, pallets that fail in stretch-wrap, loads rejected or re-stacked at the dock, and occasionally a collapsed pallet in a customer's warehouse — the most expensive kind of quality escape, because it happens in front of the customer. A robot places the same pattern the same way at 4 p.m. as it did at 6 a.m.; a rotating cast of stackers does not.

The bottleneck effect

Your line can only ship what the end of the line clears. When stacking falls behind — a break, a slow new hire, two people out — cases back up, the case packer waits, and the most expensive equipment and people in your plant stand idle behind the cheapest job in it. This is the hidden multiplier of hand palletizing: its failures are not contained at the pallet. They tax the productivity of everything upstream. It is why removing the hand-stacking bottleneck can lift overall line productivity by up to 30% on a suitable line — the gain was always there, just blocked.

Opportunity cost: what those people could be doing

The final cost is invisible because it never appears as an expense: your stackers are able-bodied, trainable people spending their shifts on the one job that adds the least value. Moved to inspection, packing support, forklift work, changeovers, or sanitation, the same hours make the plant better. On stacking, they make pallets — and leave. Automating the pallet is not really about removing people; it is about stopping the waste of them. A cobot palletizer for rent takes over the lifting while your crew moves to work worth their wages.

Putting it together

Cost elementIllustrative monthly figure
Direct labor — one stacker, one shift ($25/hr burdened × 173 hrs)$4,325
Second stacker or second shift coverage+ $4,325
Turnover — 2 replacements/yr at ~$3,000 each, spread monthly≈ $500
Injury exposure, rework, damaged cases, bottleneck lossesreal, but plant-specific
Dorna palletizer rental (installation, training, maintenance included)$1,999

Set against $4,325 a month for a single hand stacker — before turnover, injuries, rework, or a single bottlenecked hour — a $1,999 monthly rental that never calls in sick starts to look less like an expense and more like the cheapest line item at the end of your line. Depending on staffing, plants typically see up to $5,000 per month in labor savings. There is a cost calculator on our homepage that runs this comparison with your own wage and headcount in about thirty seconds.

Run your numbers in a Free Line Walkthrough

Tell us your wage, your shifts, and your case sizes. We will show you exactly what hand palletizing costs on your line — and whether the robot beats it.

Get a Free Line Walkthrough

or call +1 (480) 744-6106

Explore palletizer rental